Project :
EPC for the construction of 11 diesel electric plants in the Algerian desert.
Studies/Tasks :
- Civil engineering
- structural steel work
- piping
- general installation
- electricity
- control systems
- instrumentation
- fire detection/extinguishment
- air conditioning/ventilation
-
- 28 500 hours
- AutoCAD, CADWorx Plant Pro, Caneco BT, Caneco HT
- Electricity, General Installation, Instrumentation, Piping, Safety
- Algeria
- 2014 - 2015