Project :
Detailed instrumentation studies as part of a 2 x 165 MW thermal power plant with a fluidised bed.
Studies/Tasks :
- PIDs
- instrument list
- piping lists
- valve and fitting lists
- instrument fittings
- equipment bills of material
- equipment installation plans
-
- 700 hours
- COMOS P&ID, MicroStation
- Instrumentation
- Mexico
- 2013