Production of an as-built drawing for VINCI Environnement 08/02/18

VINCI Environnement has entrusted TVA Engineering with the production of an “As-Built Drawing” for the electricity section of its energy recovery centre in Cornwall, England.

The CERC is able to recover up to 240,000 tons of non-recyclable residual waste per year, enabling the generation of 184,000 MWh of energy per year. Completed in January 2016, the CERC spans more than 15,000 m².

Work was carried out on site at the end of 2017, enabling the cabinet wiring diagrams to be updated in the engineering and design department. This work will soon be expanded to include new readings on site in order to suggest recommendations for optimization of the components of the electrical cabinets and lighting system.

Le centre de valorisation énergétique des déchets de la province de Cornouailles (CERC).